Process
1.
Pre-Design
The first objective is to get-together with a client and determine overall project vision and goals. Irrespective of the industry being residential, healthcare, industrial, hospitality etc., there are some key areas to discuss the project – scope, features, purpose, and functionality.
In this phase, we carry out:
- Client consultation
- Existing conditions survey and documentation
- Photographs
- Measurements
- Compile existing drawings if any
- Statement of probable build/construction cost
- Programming space and use
- Code Review
2.
Concept Stage
- Floor plans of all levels with generic openings and plumbing fixtures
- Exterior building elevations with representative openings and finishes
- Building cross-section
3.
Design Development
Design development collects the results from the concept phase and takes them one step further. This phase involves finalizing the design and specifying items such as materials, window and door locations and general structural details.
At the end of this phase, we deliver:
- Floor plans with a proposed basis of design openings and plumbing fixtures
- Overall dimensions
- Structural grid dimensions
- Interior wall dimensions
- Exterior elevations with a proposed basis of design openings and finishes
- Additional building sections
- Wall sections at all typical conditions
- Typical details
- Additional details to establish a basis for design products
4.
Construction Drawings
In this phase, we do series of rough sketches/drawings that illustrate the basic concepts of the design. Also, initial research of local compliance and regulations are completed at this time.
- Floor plans fully annotated
- All dimensions
- Room, wall, door, and window identification
- Section and detail indicators
- General notes and detailed notes
- Exterior elevations fully annotated
- All building sections required for construction
- Wall sections at all conditions
- Details fully annotated
- Structural plans, details, and notes
- Plumbing plans, schedules, details, and notes
- HVAC plans, schedules, details, and notes
- Electrical power and lighting plans, schedules, details, and notes
5.
Construction
Finally, the construction is underway. During this phase, we will build as per the design intent.
Also if there are any changes, we discuss changes and options with the owner. It ensure that alterations are compatible with owner’s vision for the project. This is the last phase and at the end of this phase, a project is ready for the use/occupancy.